Skip to content

Core trade stage

Steel fixing

CPC fixes pool-shell reinforcement to the supplied engineering requirements. Every job is measured from the actual reinforcement used and the agreed complexity details.

Typical scope

  • Straight and radius-bent bars
  • Square-bent floor bars
  • Starter bars
  • Square, round and gutter spas
  • Curved walls
  • Mesh
  • Extended beams
  • Prescheduled reinforcement

Spa and extended-beam charges recognise the additional fixing complexity. Every bar used remains part of the measured work.

Scope boundary

Reinforcement design, engineering changes and certification remain with the project’s appointed engineer and builder. CPC fixes to the issued requirements and raises unclear details before proceeding.

This stage on site

  • Whole large Portsea pool reinforcement cage with a raised integrated structural zone and in-shell service penetrations.
    Portsea — large pool with integrated structural zone, fully reinforced before concrete placement.
  • Whole compact rectangular pool with floor and wall reinforcement integrated beside an active building structure.
    Builder-integrated rectangular pool — full floor and wall reinforcement before concrete.

Stage detail

  • Reinforcement cage and in-shell plumbing prepared inside a formed concrete pool structure in Camberwell.
    Camberwell — reinforcement and in-shell plumbing prepared before concrete placement.
  • Detailed multi-level reinforcement and in-shell services inside pool formwork in Axedale.
    Axedale — detailed multi-level reinforcement and in-shell services.
  • Whole curved pool renovation showing new steel reinforcement shaped through the existing shell.
    Curved pool renovation — reinforced feature geometry formed within the existing shell.

Next step

Send your plans for pricing.

Provide the plans, required stages, project location, access notes and requested programme window. Use the secure pricing form to send your plans and project details.