Core trade stage
Formwork and strip-out
CPC forms the pool shell to the agreed plans and scope, then returns after the concrete pour to strip the formwork and remove the associated formwork rubbish.
Typical scope
- Standard and wet-edge formwork
- Top boards
- Edge-beam and under-seat L-form boxing
- Curved walls
- Corbels and fully boxed corbels
- Windows priced from the plans
- Strip-out after the pour where included in the agreed formwork scope
Exact inclusions are confirmed from the plans. CPC does not design the pool structure or certify the formwork design.
What to send
Provide the architectural and engineering plans, required dates, access constraints and any window, wet-edge, seat, beam or corbel details.
This stage on site

Portsea — pool and round-spa geometry formed with in-shell plumbing in place.
Stage detail

Toorak — formwork, floor steel, wall reinforcement and in-shell services. 
Rounded-corner pool layout — formwork defining the overall geometry before reinforcement. 
Long narrow pool and spa — full reinforcement and pre-pour setup.
Next step
Send your plans for pricing.
Provide the plans, required stages, project location, access notes and requested programme window. Use the secure pricing form to send your plans and project details.
